Golden 24 hours principle ----all the responses should be done within 24 hours!Step.1 Order Step.2 DFMEA Step.3 Tooling BOM Form Step.4 Tooling 2D DrawingStep.5 Cutting Tooling Notice Step.6 Weekly Report Step.7 Tooling 3D drawing Step.8 Dimension Report of T1 sampleStep.9 Packing Information Step.10 CDStep.11 3000 cycles testing for toolin...
timeTue, 02 Jan 2018 13:18:53 GMT
Step.1 Order1. Confirm Order2. Issuer PI3. Provide Engineers with part drawings and special requirements
timeTue, 02 Jan 2018 13:21:32 GMT
Step.2 DFMEADFMEA(Design Failure Mode & Effect Analysis ) should be prepared before the 2D tooling design ,which should include P/L, Gate location, Ejector pins and the basic structure of tooling as well as the comments for any parts design defects. This is a good way to save much time and cost for tooling design and fabrication.
timeTue, 02 Jan 2018 13:22:29 GMT
DFMEA REPORT SHOW ...
timeTue, 02 Jan 2018 14:25:03 GMT
DFMEA REPORT SHOW ...
timeTue, 02 Jan 2018 14:29:09 GMT
BOM Form Longxiang Group Limited Mold information Longxiang Project No Basic information Mold basic information Project No. Mold base brand Mold base level ...
timeTue, 02 Jan 2018 14:30:40 GMT
Cutting Tooling Noticd Cutting Tooling Steel Notice P.O Tooling No. Resin Color Shrinkage Rate Tooling core Surface of ...
timeTue, 02 Jan 2018 15:56:35 GMT
Weekly Report Project Name: LXGL182 P.O.Date: 2-Apr-18 T1 Date: 30-Apr-18 Report Date: 2-Apr-17 This is a weekly ...
timeTue, 02 Jan 2018 15:57:38 GMT
CDContents: 1. Tooling 2D 2. Tooling 3D 3. Dimension Report 4. Photograph 5. Video
timeTue, 02 Jan 2018 16:01:40 GMT
3000 cycles testing for tooling ejecting system
timeTue, 02 Jan 2018 16:02:46 GMT