Follow us :

What's the tooling developing procedure in Longxiang?

Golden 24 hours principle
                            ----all the responses should be done within 24 hours!


Step.1    Order 
Step.2    DFMEA  
Step.3    Tooling BOM Form 
Step.4    Tooling 2D Drawing
Step.5    Cutting Tooling Notice 
Step.6    Weekly Report 
Step.7    Tooling  3D drawing 
Step.8    Dimension Report of T1 sample
Step.9    Packing Information 
Step.10  CD
Step.11  3000 cycles testing for tooling ejecting system
Step.12  Plastic Mould Operation Manual